Description
This WBS Spanish Study Bible uses the NVI translation. It has a brown leatherette cover and texture in 8-point font. It measures 7 3/8” x 5 1/16” x 1 1/8”. It contains the WBS Study Notes in Spanish to encourage individual study or for use in personal or group Bible studies.











